Pick a model, see the honest price range, then send the details for a written quotation
These are our current factory ranges, the same numbers shown on each model page. The final figure depends on silo capacity, control system, motor voltage and what you ask us to include.
Prices are FOB Qingdao / Shanghai, exclusive of freight and installation travel costs. Ranges, not fixed prices — a written quotation follows the form below.
The calculator cannot see your site. The form can. Fill in what you know — if a field is unknown, write "not sure" and we will work it out with you.
Two quotations for the "same" HZS120 can differ by 40%. In our experience these are the seven reasons, in order of how much money they involve.
| Factor | Why it changes the number | Typical effect |
|---|---|---|
| Plant size | Mixer size and structure scale with output; it is the single biggest line | HZS60 to HZS240 spans $48k to $400k |
| Aggregate bin capacity | More bins and thicker plate cost steel and freight volume | +$3k to +$12k |
| Control system | A PC-and-PLC package with production reporting and remote support is a different build from a basic PLC cabin | +$2k to +$6k |
| Cement silo and screw conveyor | Often quoted apart from the plant, sometimes quietly omitted by competitors | +$4k to +$18k per set |
| Motor voltage and frequency | Non-standard 440V/60Hz means different motors and a different panel | +0% to +5% |
| Foundation and steel structure | We supply drawings; the concrete and the piling are yours. Buyers who forgot this line are the most common delay | 10–20% of plant value, local cost |
| Freight, insurance and port | Break-bulk and flat-rack shipping are volatile and priced per route | 8–20% of plant value |
You do not need all of this to send the form. You do need it before you can compare two suppliers honestly.
| Model | Output | Lead time from deposit | Our engineer on site | Foundation note |
|---|---|---|---|---|
| HZS60 | 60 m³/h | 25–35 days | 10–15 days | Reinforced raft, plant GA drawing required |
| HZS90 | 90 m³/h | 25–35 days | 10–15 days | Reinforced raft, plant GA drawing required |
| HZS120 | 120 m³/h | 25–35 days | 10–15 days | Reinforced raft + separate mixer platform |
| HZS180 | 180 m³/h | 25–35 days | 15–20 days | Piled or raft foundation, engineering review required |
| HZS240 | 240 m³/h | 25–35 days | 20–25 days | Piled or raft foundation, engineering review required |
Payment: T/T with 30% deposit and 70% before shipment is standard; L/C at sight accepted; USD, EUR or RMB. Lead time: 25–35 days for standard configurations, 40–50 days if customised or during peak season. Installation guidance and operator training are included in the plant price — you cover the engineer's flights, visa, local transport and board.
| Model | Output | Price range (USD) | Lead time |
|---|---|---|---|
| HZS60 | 60 m³/h | $48,000 – $75,000 | 25–35 days |
| HZS90 | 90 m³/h | $65,000 – $100,000 | 25–35 days |
| HZS120 | 120 m³/h | $85,000 – $130,000 | 25–35 days |
| HZS180 | 180 m³/h | $120,000 – $180,000 | 25–35 days |
| HZS240 | 240 m³/h | $250,000 – $400,000 | 25–35 days |
Standalone twin-shaft mixers, same factory:
| Model | Drum / output | Price range (USD) | Lead time |
|---|---|---|---|
| JS500 | 0.5 m³ / 25–30 m³/h | $3,000 – $4,500 | 20–30 days |
| JS750 | 0.75 m³ / 30–35 m³/h | $4,500 – $6,500 | 20–30 days |
| JS1000 | 1.0 m³ / 40–50 m³/h | $7,000 – $10,000 | 20–30 days |
| JS1500 | 1.5 m³ / 55–65 m³/h | $12,000 – $18,000 | 20–30 days |
| JS2000 | 2.0 m³ / 70–85 m³/h | $18,000 – $26,000 | 20–30 days |
| JS4000 | 4.0 m³ / 140–170 m³/h | $38,000 – $52,000 | 20–30 days |
It gives an indicative FOB range for the plant itself, based on our current factory pricing. It is not a quotation. Freight, insurance, foundation civil works, crane hire and local taxes are not included, and any optional item can move the final number by 10–20%. A written quotation follows the configuration sheet we send you.
The batching plant as specified: aggregate bins, weighing hoppers and load cells, twin-shaft mixer, cement screw conveyors, control cabin with PLC and software, the standard cable set, and one set of commissioning spares. Not included: foundation and civil works, steel structure erection crane, sea freight, marine insurance, destination port charges and import duty.
T/T with 30% deposit and 70% before shipment is our standard term. We also accept L/C at sight, and for repeat customers we can discuss other arrangements. Payment can be made in USD, EUR or RMB.
Standard configurations leave the factory in 25–35 days from receipt of deposit. Customised plants, non-standard voltages, or orders placed during peak season take 40–50 days. We will confirm the exact date in writing before you pay.
Yes. Installation supervision and operator training are included in the plant price. Our engineer travels to your site and stays through commissioning and handover: 10–15 days for HZS60, HZS90 and HZS120, 15–20 days for HZS180 and 20–25 days for HZS240. You cover the engineer's flights, visa, local transport, and board and lodging.
Yes. Motors, contactors and the control system are built to the voltage and frequency you specify — 380V/50Hz, 415V/50Hz, 440V/60Hz and 480V/60Hz are all routine. Tell us the site voltage in the form and it is built into the quotation, not added later as a surprise.
Practically: mixer blades and liners, the discharge gate seal, conveyor belt splice kit, load cell (one spare), proximity and limit switches, and a set of fuses and contactors. We ship a recommended wear-parts list with the plant and quote it separately so you can budget before the first failure, not after.
Yes, and we recommend it for any order above HZS120. Our works are in Xingyang, Zhengzhou, Henan. Send your travel dates and we arrange pickup from Zhengzhou airport or the high-speed rail station, a line walk-through, and a run test on a plant of similar size.
WhatsApp +86 187 6888 8850 · Email hzs@hzsglobal.com · Factory: No.128 Wulong Industrial Park, Xingyang, Zhengzhou, Henan, China